best injection moulding machine in world

Quick Details


Condition: New
Type: Preform Injection
Style: Horizontal
Plastic Type: Thermoplastic
Automatic: Yes
Injection Weight: 1756g~2525g
Injection Rate: 409cm³/s~589cm³/s
Clamping Force: 5000KN
Opening Stroke: 740mm
Power(W): 25+25KW
Certification: CE
After-sales Service Provided: Engineers available to service machinery overseas
color: whit and green
Power supply monitored: Included
USB conect: Included
Ejector platen safety device: Included
Closed loop PID termperature control: Included
Mold temperature control .: Included
screen: color LCD
Open nozzle with nozzle head: Included
Hopper with cover, approx.: Included
type: injection molding machine

 

Technical Parameters


Injection Unit
Screw Diametermm758490
Screw L/D RatioL/D22.42018.6
Shot Volumecm³193024202780
Injection Weight(PS)g175622002525
Injection PressureMpa204163142
Injection Ratecm³/s409513589
Plasticizing Capacityg/s67.394.5113
Screw Speedrpm0-165
Clamping Unit
Clamping TonnageKN5000
Toggle Strokemm740
Space Between Tie-barsmm800x800
Max. Mold Heightmm850
Min. Mold Heightmm350
Ejector Strokemm200
Ejector TonnageKN150
Ejector NumberPiece13
Others
Max. Pump PressureMpa16
Motor PowerKW25+25
Heater PowerKW25.9
Machine Dimensionm8.2x2x2.8
Machine Weightton22.5
Oil Tank CapacityL1050

 

Our Services


1.Your inquiry will be replied in 24 hours

2.3 years Gold supplier continuously in Alibaba.

3.To offer free spare parts and service within 12 months of warranty

4.Technology Support Provide operation video for training

5.Professional after-sales service team

6.Give reasonable offers with the best quality

 

Warranty


Warranty: One year from the date from the date of Installation or acceptance of the Plant whichever comes first.

Free Spare Parts : Digital instrument, Sealing, Stretching cylinder seal ring, Mould-adjustment wrench, Furnace temperature table, Furnace heating tube and other relative vulnerable part .

Installation: Experts’ team to buyer’s country after confirmation that the goods arrived in site and civil works completed get ready for installation. Funds for trip need to be payed by client and extra salary $50/day during the engineer’s journey.

,